Avaire Forum  

Go Back   Avaire Forum > Public Information > Bathrooms > under or up to a new shower install

Thread: under or up to a new shower install Reply to Thread
Your Username: Click here to log in
Image Verification
Title:
  
Message:
Post Icons
You may choose an icon for your message from the following list:
 

Additional Options
Miscellaneous Options

Topic Review (Newest First)
06-24-2009 11:17 AM
Avaire Archive Author: Chris
Date: 3/14/2009 10:42 am EDT
No matter what type of flooring you're installing it's allways best to install all permanent fixtures first. After the shower base is installed install the Avaire tile then just place a bead of flexible caulk between the shower base and the tile.
06-24-2009 11:17 AM
Avaire Archive
under or up to a new shower install

Author: Melanie
Date: 3/13/2009 12:41 am EDT
We are redoing our bathroom and plan to use Avaire flooring. We are also installing a new shower unit (fiberglass type). Do you recommend laying the entire floor first and placing the shower on top of the tile or placing the shower first and tiling up to the shower?

Posting Rules
You may post new threads
You may post replies
You may not post attachments
You may edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT -5. The time now is 06:13 PM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.

(888) 528-2473 Copyright © 2009 : CoMc, LLC All Rights Reserved. ~ Design by Chip Thompson