Avaire Forum  

Go Back   Avaire Forum > Public Information > Trims and Transitions > baseboards

Thread: baseboards Reply to Thread
Your Username: Click here to log in
Image Verification
Title:
  
Message:
Post Icons
You may choose an icon for your message from the following list:
 

Additional Options
Miscellaneous Options

Topic Review (Newest First)
06-24-2009 02:44 PM
Avaire Archive Author: chris
Date: 5/11/2009 9:29 am EDT
After the tile is installed just place the baseboards on top of the tile so it covers the 1/4" perimeter joint. Hope this helps.
06-24-2009 02:44 PM
Avaire Archive
baseboards

Author: Paula
Date: 5/8/2009 9:48 pm EDT
We have already removed all baseboards in the bathroom. We are ready to tile. Do we put the baseboards back in after tiling all the way to the bottom of the perimeter gap? Or do we place the bottom of the baseboard level with top of tile?

Posting Rules
You may post new threads
You may post replies
You may not post attachments
You may edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT -5. The time now is 02:41 PM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.

(888) 528-2473 Copyright © 2009 : CoMc, LLC All Rights Reserved. ~ Design by Chip Thompson