![]() |
Installation
Author: Jim Kennedy
Date: 11/17/2008 11:37 am EDT Ok gang -- installation went ok, despite my worrying about level, etc. Cutting hole for toilet flange was a piece of cake with wet saw: simply drew the arc and then cut triangular wedges, with apex of triangle at the arc line. Now at the stage of "gobbing"!!!!!!!!! Thanks for your help |
Author: Journeyman
Date: 11/17/2008 3:21 pm EDT Oh-oh! I may have started something. I vote we make "gobbing" a recognized procedure in floating-floor installations.:) |
| All times are GMT -5. The time now is 04:24 AM. |
Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.