Avaire Forum

Avaire Forum (http://www.avairefloors.com/forum/index.php)
-   Bathrooms (http://www.avairefloors.com/forum/forumdisplay.php?f=27)
-   -   under or up to a new shower install (http://www.avairefloors.com/forum/showthread.php?t=258)

Avaire Archive 06-24-2009 11:17 AM

under or up to a new shower install
 
Author: Melanie
Date: 3/13/2009 12:41 am EDT
We are redoing our bathroom and plan to use Avaire flooring. We are also installing a new shower unit (fiberglass type). Do you recommend laying the entire floor first and placing the shower on top of the tile or placing the shower first and tiling up to the shower?

Avaire Archive 06-24-2009 11:17 AM

Author: Chris
Date: 3/14/2009 10:42 am EDT
No matter what type of flooring you're installing it's allways best to install all permanent fixtures first. After the shower base is installed install the Avaire tile then just place a bead of flexible caulk between the shower base and the tile.


All times are GMT -5. The time now is 06:01 PM.

Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.