![]() |
|
#1
|
|||
|
|||
![]()
Author: Paula
Date: 5/8/2009 9:48 pm EDT We have already removed all baseboards in the bathroom. We are ready to tile. Do we put the baseboards back in after tiling all the way to the bottom of the perimeter gap? Or do we place the bottom of the baseboard level with top of tile? |
#2
|
|||
|
|||
![]()
Author: chris
Date: 5/11/2009 9:29 am EDT After the tile is installed just place the baseboards on top of the tile so it covers the 1/4" perimeter joint. Hope this helps. |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|