Avaire Forum  

Go Back   Avaire Forum > Public Information > Bathrooms

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 06-24-2009, 11:17 AM
Avaire Archive Avaire Archive is offline
Archive
 
Join Date: Jun 2009
Posts: 943
Default under or up to a new shower install

Author: Melanie
Date: 3/13/2009 12:41 am EDT
We are redoing our bathroom and plan to use Avaire flooring. We are also installing a new shower unit (fiberglass type). Do you recommend laying the entire floor first and placing the shower on top of the tile or placing the shower first and tiling up to the shower?
Reply With Quote
  #2  
Old 06-24-2009, 11:17 AM
Avaire Archive Avaire Archive is offline
Archive
 
Join Date: Jun 2009
Posts: 943
Default

Author: Chris
Date: 3/14/2009 10:42 am EDT
No matter what type of flooring you're installing it's allways best to install all permanent fixtures first. After the shower base is installed install the Avaire tile then just place a bead of flexible caulk between the shower base and the tile.
Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may post new threads
You may post replies
You may not post attachments
You may edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 04:24 PM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.

(888) 528-2473 Copyright © 2009 : CoMc, LLC All Rights Reserved. ~ Design by Chip Thompson